Monday, March 22, 2010

The Bunker



Building the Bunker. It's getting there.






























Today we got the floor ready for staining. Nine riders showed up and got right to work; Bruce Dolecek, George Bair, Gary Webb, Kevin VanVelzor, Paul Leddy, Roland Bushey, Sam Langhofer, and Mike St.Clair. First we moved all the tables and chairs out to the main meeting room, then the TV and popcorn machine was mover into the kitchen. Two started in on the concrete seams, cleaning out the suff that ended up there, and two more drug out the shopvac while two more got busy with brooms.







About an hour later it was time for the buckets and mops. After the initial cleaning with cleaning solution the moppers started in with clean water. Three trips down the floor with clean water the floor was deemed clean enough to let dry.

Tomorrow we start with sealing the floor and then do the staining.



The sealing is all done along with the staining.
Looks good.





No comments:

Post a Comment